![]() |
![]() |
|
|
|||||||||||||||||||||||||||||||||||||||||||||
Once settlement occurs, additional suppport must be added beneath the foundation. The POWER Lift system hydraulically installs steel pilings under the foundation to assure that no future settlement can occur. Our piers are driven to bed rock or an equal load bearing strata to stop foundations from settling. |
![]() |
|||
With the proper pier placement and installation, elevation losses due to settlement can be recovered, generally closing cracks in the brickwork as shown above. While 100% recovery is not always possible, POWER Lift has the knowledge and equipment to accomplish the best possible results. |
|||
|
|
|
|||||||||||||||